Get the latest from The Concord Group
Share This article
A well-run capital healthcare project doesn’t just happen. It’s the result of smart planning, accurate budgeting, and careful coordination. Whether it’s a new hospital build, a clinical renovation, or a major equipment upgrade, project success depends on getting the details right from the very beginning.
One of the most critical—yet often underestimated—components of any healthcare construction project is Medical Equipment Planning (MEQ). In fact, medical equipment can easily account for 15% to 25% (or sometimes even more) of the total project budget, depending on the type of facility, the technology being used, and the services being delivered.
Yet despite the size of that investment, many projects still treat Medical Equipment Planning as an afterthought. Even more concerning, the MEQ budget is often inaccurate, based on outdated cost estimates, recycled numbers from past projects, or, in some cases, someone’s “best guess.” That might get the project moving, but it often leads to serious budget issues, expensive delays, and difficult decisions about what equipment or rooms to scale back on.
In this blog, we’ll take a closer look at what MEQ is, why inaccurate or outdated budgets are such a common problem, and how engaging an MEQ team early can make all the difference.
Medical Equipment Planning (MEQ) is the process of selecting, budgeting, and coordinating medical equipment for a healthcare facility. The goal is to ensure the right equipment is available at the right time, properly integrated with the design and construction process, and aligned with the facility’s goals for patient care and operational efficiency.
MEQ covers everything from identifying equipment needs and establishing an accurate budget to procurement, delivery logistics, installation, testing, and transition planning. In short, it’s not just about selecting the right equipment. It’s about ensuring the entire process runs smoothly and efficiently, without compromising the care your team provides.
The process of Medical Equipment Planning involves selecting, budgeting, and coordinating medical equipment. But ironically, the budget is often determined before the MEQ team is even brought on board. And that’s where the real problem begins.
Here’s the scenario we run into all too often at Concord: Our MEQ team is pulled into a project after the equipment budget has already been set, typically without input from specialists or a clear understanding of the actual clinical requirements.
“Sometimes I look at the budget we’re given and think, ‘How on earth did they come up with this number?'” says Debbie Heitzman, Director of Medical Equipment Planning at The Concord Group.
“In fact, one time we were engaged on a project after a $5 million MEQ budget had already been established. But after determining the hospital’s actual needs and requirements, we quickly realized the budget needed to be closer to $11 million. When we asked how they ended up at $5 million, we were told it simply ‘sounded good.’”
While this story is amusing, these unrealistic budgets create very real problems, especially when they’re locked in early and used as the basis for Certificate of Need (CON) applications or capital fundraising efforts. Once that number is on paper, adjusting it can be difficult, costly, or even impossible without opening the project to objections, delays, redesigns, or resubmissions.
It’s not uncommon for project teams to reuse an MEQ budget from a previous build, especially if the last project was similar in size or scope. However, in healthcare, even a few years can significantly alter pricing, availability, and technology requirements.
Medical equipment budgets built on old data rarely account for:
And let’s not forget, today’s healthcare organizations are always striving to deliver the latest advancements in patient care and clinical technology.
“No one wants technology that’s five years old. Everyone wants the newest, most advanced technology,” says Debbie. “But that tech comes with a higher price tag—and old budgets just don’t reflect that. You can’t plan today’s project with yesterday’s numbers.
In many states, healthcare facilities must submit a Certificate of Need (CON) to gain approval for major capital expenditures and projects. The CON includes detailed cost projections, including the medical equipment budget. Once submitted, those numbers become part of the official, approved scope, and can’t be easily changed.
In most cases, if the budget turns out to be inaccurate or incomplete, it can’t simply be updated later. Revisions often require a formal resubmission process, which can delay the project, trigger competitor objections, and even add administrative and legal hurdles.
“If you realize the MEQ budget is too low after the CON is submitted,” Debbie explains, “you’re faced with a tough choice. Either find a way to make it work within the existing number, or go through the costly process of resubmitting, which can trigger objections from competing healthcare providers and lead to lengthy delays.”
This is one of the most overlooked risks in healthcare capital planning. Because the CON locks in your budget and scope, an inaccurate MEQ estimate can limit the project from the start. Teams may be forced to make difficult compromises, delay purchases, or scale back services just to stay compliant.
And the irony? Equipment is often one of the last things purchased, so it becomes one of the first places teams look to cut when other costs go over budget.
Even with a realistic equipment estimate at the beginning, MEQ is frequently one of the first line items to get trimmed when construction, design, or other costs start to escalate. Why? Because medical equipment purchases typically happen late in the project timeline, long after other budget decisions have been made.
This leaves your team scrambling to find savings, often through:
These short-term fixes have long-term consequences. They may reduce operational efficiency, frustrate clinical staff, or limit your ability to attract top-tier providers. This is especially true when the available technology can’t support the level of care your team is expected to deliver.
Medical Equipment Planning is about more than just the cost of equipment. Rather, it’s about understanding the clinical intent of the space and aligning the equipment strategy to support it. That means your MEQ team should be asking:
At Concord, we break down MEQ budgets by department and equipment type, giving stakeholders a clear understanding of what’s included (and what’s not). More importantly, our estimates are based on real-world data from current projects, not outdated information or generic industry averages.
Our medical equipment planners bring extensive, hands-on clinical experience in selecting the right equipment, as well as a deep understanding of how today’s buying prices, tariffs, inflation, shipping costs, and rapid advances in medical technology impact your budget. That level of insight allows us to deliver accurate, realistic MEQ estimates that reflect the true cost of providing the care your facility is designed to deliver.
Which brings us to a key takeaway:
When brought in early, the MEQ team plays an essential role in determining project feasibility and establishing a realistic, data-driven equipment budget. Much like a cost estimator for construction, an experienced medical equipment planner can help you evaluate whether your vision is achievable within your financial parameters. If not, they can provide guidance on how to adjust the plan while still meeting your core priorities.
“We’ve worked on several projects recently where the original MEQ budgets were set before we got involved—and they just weren’t realistic,” Debbie says. “If our team had been brought in early to help shape the budget, the owners could’ve avoided months of redesign, Certificate of Need resubmission, and rework.”
And while engaging an MEQ consultant early may seem like another extra cost, it’s often what protects the project from the most expensive problems later on. Without accurate, early input on the equipment budget, you could face unexpected costs, rushed decisions, and compromises that ripple through design, operations, and patient care.
Debbie puts it clearly: “When you’re looking at undertaking a complex healthcare project, accurate MEQ planning is absolutely essential. It sets the foundation for everything that follows, and getting it right early on can save you a lot of time, stress, and rework.”
By involving a Medical Equipment Planning team early in the process, you’re getting more than just a list of equipment. You’re building a clear, coordinated roadmap that sets you up for success and keeps the project moving forward with confidence.
Too many healthcare projects start with a medical equipment budget that’s outdated, unrealistic, or pulled from a previous project—without input from a qualified MEQ team. That one decision can lead to months of delays, resubmissions, redesigns, and costly compromises.
Engaging a Medical Equipment Planner early helps you answer two critical questions: Is this project financially feasible? And what’s it actually going to take to equip this facility the right way? Engaging the right team from the start helps you create an accurate budget that supports a successful outcome.
We’d love to help. Concord’s experienced Medical Equipment Planning team can work with you early in the process to develop an accurate, data-driven equipment budget—before it keeps you up at night. Contact us today to learn how our MEQ services can set your facility up for long-term success.
About The Author

Debbie Heitzman is Director of Medical Equipment Planning at The Concord Group, bringing more than 30 years of leadership in healthcare planning, procurement, and installation. She has managed equipment planning for over 25 million SF of healthcare construction and $500 million in budgets, with recognized expertise in surgical and operating room environments. Debbie’s clinical background as a registered nurse gives her unique insight into the needs of both patients and providers.
Share This article

The Concord Group is a development + construction consulting firm providing a comprehensive and fully integrated suite of project management controls that mitigate risk throughout the lifecycle of a project or capital program. We specialize in Owner’s Representation, Cost Estimating, Medical Equipment Planning, and Building Performance Services (including Commissioning, Facility Condition Assessments, and Sustainability Consulting).
Since 1996, our team of highly skilled construction cost consultants, project managers, owner representatives, cost estimators, medical planners, and engineers has successfully completed over 4,000 projects throughout the United States. We have built a reputation for delivering high-quality, accurate, and timely work for governmental agencies, healthcare organizations, institutional clients, and architectural/engineering firms, along with retail, residential, and property development companies.
Get the latest from The Concord Group