Building Commissioning FAQ:
What You Need To Know

Share This article

Building Commissioning FAQ

Do you know if your building is performing the way it was designed to?

Consider the following scenarios: You’ve just moved into a brand-new facility, only to find a state-of-the-art HVAC system that can’t keep up in the summer months or is driving unexpectedly high energy bills. Or perhaps you work in an older building where operating expenses continue to rise, and occupants complain about hot and cold zones. Even newly renovated spaces can encounter problems if systems aren’t properly checked after upgrades.

Building commissioning is the process that catches these problems early, verifying that every system—from HVAC and plumbing to lighting, emergency power, refrigeration, and life safety—operates as intended. But it’s not only about fixing issues after the fact; commissioning also plays an essential role in helping new facilities meet performance targets required to achieve LEED certification.

Surprisingly, many buildings have never been commissioned. Missing this step can lead to higher operating costs, inefficient systems, premature equipment failure, ongoing maintenance challenges, and even safety issues. In this FAQ, we’ll break down the most common questions about commissioning—what it is, why it matters, and how it impacts your building’s performance.

What is Building Commissioning?

Building commissioning is the process of verifying that a building and all of its systems are designed, installed, tested, and operating as intended. It covers everything from mechanical systems like HVAC and ventilation, to electrical and lighting, building controls, plumbing, fire and safety systems, communication systems, and the building envelope (walls, roofs, windows, and doors).

The commissioning process begins by verifying that each system component meets performance requirements through inspecting the installation and conducting testing. These components are then coordinated into fully functional systems and integrated into a cohesive, optimized building. Finally, commissioning documents the entire process, establishing performance benchmarks, and creating a clear roadmap for operation, maintenance, and future upgrades.

Commissioning isn’t just a one-time check. Rather, it is a holistic approach that spans from pre-design and construction through occupancy, helping owners reduce operational costs, improve energy efficiency, enhance comfort and safety, and extend the lifespan of their building and systems.

What are the Main Building Systems Involved in Commissioning?

  • Mechanical systems such as HVAC, ductwork, and ventilation systems
  • Building Automation Systems
  • Electrical systems such as power distribution and lighting controls
  • Plumbing systems
  • Communication and alarm systems
  • Protective systems such as fire/smoke protection
  • The building’s “envelope,” including the walls, roof, windows/curtainwall, doors, etc.

What are the Four Types of Building Commissioning?

  1. Commissioning / New Construction Commissioning: Ensures the systems of a newly designed or under-construction building are installed and functioning as intended from the outset. This type of commissioning is highly impactful because it identifies potential issues early and takes preventative action.
  2. Retro Commissioning: Focuses on existing buildings that were never commissioned when originally built. This process seeks to improve performance by identifying problems that developed over time due to equipment aging, design oversights, or changes in building use.
  3. Recommissioning: Applies to an existing building that has already been commissioned. It reassesses systems after the building is fully operational and the owner has a more accurate picture of how the building is being used. Recommissioning helps maintain efficiency, extend equipment life, and ensure all systems continue to perform as designed.
  4. Continuous Commissioning: An ongoing process that monitors, adjusts, and optimizes building systems over time. It leverages technology and data-driven strategies to maintain energy efficiency, resolve operational issues, maximize energy savings, and adapt systems to evolving operational or sustainability objectives.

What’s the Difference Between Retro-Commissioning and Commissioning?

Commissioning applies to new construction projects to ensure building systems work as designed, while retro-commissioning applies the same principles to existing buildings that were never commissioned when they were originally built. Both involve inspecting, testing, and optimizing building systems. The difference is in timing: commissioning typically occurs during design and construction, whereas retro-commissioning focuses on improving the performance of older buildings.

What is the Commissioning Process?

  1. Pre-Design / Planning: The commissioning team is identified, and the owner’s project requirements (OPR) are defined. Additionally, a preliminary commissioning plan is developed, and the initial commissioning budget is established.
  2. Design: More detail is given to building systems, including design specifications, documents, and drawings. This stage helps to ensure the owner’s project requirements are properly defined and accurately considered in the contract documents. The commissioning team also begins monitoring the established OPR, conducting commissioning design reviews, and refining the commissioning plan.
  3. Construction: When construction begins, the commissioning process becomes critical. The commissioning team verifies that the systems and components are operating to meet the project requirements and contract documents. Construction-phase commissioning activities include ensuring quality through installation, start-up, performance system testing, and training.
  4. Issue Resolution: From the moment commissioning begins through project completion, issues are identified, documented, communicated, and tracked until they are officially resolved. The commissioning team participates in the resolution of most issues associated with their scope of work. They will communicate with other team members, including the Owner, designers, and contractors, provide supporting documentation or research, and track the issues until they are resolved.
  5. Occupancy and Operations: When the construction project is complete, this final stage is used to close out the commissioning process, clear any defects, and finalize any outstanding documentation. It includes performing deferred and seasonal testing, reinspecting performance prior to the end of warranty periods, and completing the final commissioning report.
  6. LEED Certification: Commissioning is required to achieve LEED certification. An experienced commissioning agent can help project teams meet the requirements of LEED certification and earn points toward a higher LEED rating.

What is the Main Purpose of Building Commissioning?

The main purpose of building commissioning is to ensure that a building and its systems operate as intended and meet the owner’s project requirements. It helps optimize performance, reduce costs, prevent future problems, and provide clear documentation for ongoing operations.

Commissioning can help:

  • Deliver a building that performs according to its design intent.
  • Verify that all systems and components are installed and working correctly with benchmarks in place.
  • Lower energy, operation, and maintenance costs.
  • Prevent future problems and costs through proactive quality measures.
  • Provide accurate documentation to support future operations and maintenance.
  • Optimize overall building performance.

What are the Benefits of Building Commissioning?

Commissioning improves building efficiency, reduces operational costs, extends equipment life, enhances occupant safety, and supports sustainability goals.

  • Better Energy Performance: Ensures systems meet design standards, lowering utility bills and carbon footprint.
  • Operational Cost Savings: Reduces repairs, maintenance, and replacement costs while extending equipment life.
  • Fewer Project Delays and Change Orders: Resolves issues early to keep construction on schedule.
  • Improved System Function & Equipment Longevity: Prevents breakdowns and premature wear.
  • Seamless Transition from Design to Operation: Integrates planning, construction, and operation for consistent performance.
  • Maintain Performance Over Time with Re-Commissioning: Keeps systems efficient through monitoring and adjustments.
  • Healthier, More Sustainable Buildings: Improves ventilation, air quality, and meets sustainability standards.
  • Enhanced Occupant Comfort and Safety: Optimizes temperature, humidity, airflow, and overall indoor environment.
  • Proactive Warranty Management: Identifies post-occupancy issues under warranty and documents performance.
  • Greater Peace of Mind: Provides confidence that the building will perform reliably and meet owner expectations.

What Drives Building Commissioning Projects?

Building commissioning is driven by a combination of performance goals, regulatory requirements, and operational needs. Common drivers include:

  • Achieving energy efficiency and sustainability targets.
  • Meeting LEED or green building certification requirements.
  • Ensuring code compliance.
  • Reducing energy, operating, and maintenance costs.
  • Improving overall building function, reliability, and occupant comfort.

Examples of commissioning drivers in practice:

  • Private commercial buildings: Owners want energy savings, LEED certification, and comfortable, safe spaces for tenants.
  • Institutional buildings: Museums, schools, and libraries often focus on reliability, low maintenance costs, and precise climate control for collections or equipment.
  • Mission-critical facilities: Hospitals and data centers require continuous operation, high reliability, and optimized system performance.

In short, commissioning projects are driven by the need to optimize performance, efficiency, and reliability, tailored to the building’s purpose and the owner’s priorities.

What Does a Commissioning Report Include?

A commissioning report documents the entire commissioning process, verifying that building systems are installed, tested, and operating as intended. It serves as a detailed guide for owners to understand maintenance needs, system performance, and operational requirements.

The commissioning report typically includes:

  • System verification records and functional test results
  • Owner Project Requirements (OPR)
  • Deficiency logs and corrective action documentation
  • Recommendations for ongoing operation and maintenance

Systems covered in the report include:

  • Mechanical systems (HVAC, ductwork, ventilation)
  • Building Controls
  • Electrical and lighting systems
  • Plumbing systems
  • Fire and life safety systems
  • Building envelope components (walls, roofs, windows, doors)

Essentially, the report serves as a guide for the building owner to understand maintenance and operational needs. It summarizes the commissioning process and offers an overview of findings to ensure all systems are optimized, compliant, and ready for reliable operation.

Can Building Commissioning Save Significant Costs?

Yes, commissioning can help your organization save costs by reducing energy consumption, lowering operational and maintenance expenses, extending equipment lifespan, and improving overall building performance.

Here is an itemized summary of cost savings by utilizing the commissioning process with your building:

  • Reduced energy consumption
  • Lower operational and maintenance costs
  • Improved system performance
  • Extended equipment lifespan
  • Cost-effective investment
  • Long-term financial benefits
  • Significant return on investment
  • Increased building longevity

How Often Does a Building Need to be Commissioned?

The frequency required for commissioning depends on a building’s age, its history, and operational needs. For most buildings, commissioning is recommended initially during construction, and then re-commissioned every 3 to 5 years. In addition, ongoing or continuous commissioning allows for continuous monitoring of the building’s performance, ensuring that its standards and requirements remain accurate and up to date.

Is My Building a Candidate for Retro Commissioning?

Your building may be a good candidate for retro-commissioning if it has never been commissioned before, has increasing operating costs, frequent occupant complaints about comfort factors such as temperature or air quality, has undergone renovations, changes in use, or has systems that are malfunctioning. Consider a formal assessment by a commissioning provider to confirm your building’s suitability for retro-commissioning.

The following are common indicators that your building may be ready for retro-commissioning:

  • Has not been previously commissioned
  • Has rising operational costs
  • Occupant complaints
  • Changes in building use
  • Recent renovations or expansions
  • Persistent system issues
  • Old age of equipment
  • Regulatory requirements, such as a retro-commissioning mandate

How Does Commissioning Help with Warranty Management?

Commissioning identifies system issues early, so you can address them while they are still under warranty. Testing and verifying performance during occupancy provides detailed documentation of system function, enabling owners to hold contractors and manufacturers accountable.

Who is Responsible for the Building Commissioning Process?

Building commissioning is a collaborative process, and responsibility is shared across multiple roles.

Commissioning Management Team:

  • Owner: Provides project requirements, oversees outcomes, and ensures resources are available.
  • Owner’s Representative: The owner’s representative acts as the Owner’s advocate, overseeing all project phases to align with goals and interests.
  • Commissioning Provider / Agent (CxP): Leads the commissioning process from start to finish. The CxP verifies system performance, oversees design reviews, installation, testing, and staff training, and documents all results.

Key Pillar Team Members:

  • Architect: Helps develop and refine the Owner’s Project Requirements (OPR) and ensures system performance requirements are incorporated into design drawings and specifications.
  • Engineer: Assists in OPR and Basis of Design development, reviews commissioning checklists, oversees testing, and manages design resolution for systems they design.
  • Contractor / Construction Manager: Executes construction, installs systems, and ensures installation quality, coordinating closely with the CxP.
  • Subcontractors & Installers: Provide installation documentation, assist with system checks, and support functional performance testing.
  • Manufacturers & Suppliers: Supply equipment documentation, installation guidance, and operational instructions to the team.
  • LEED or Program Administrator (if applicable): Ensures commissioning aligns with sustainability standards and certification requirements.

How Much Does Building Commissioning Cost?

The cost of commissioning varies based on building size, complexity, and project scope, but it is typically a small percentage of total construction costs, ranging from 0.25% to 2%. While exact numbers differ, the real value comes from the return on investment: commissioning can reduce energy bills, prevent costly system failures, extend equipment life, and minimize maintenance and operational expenses. Many owners find that the savings over the building’s life far exceed the initial investment.

Is Commissioning Required for LEED Certification?

Yes. According to the U.S. Green Building Council, LEED certification requires a form of commissioning called Fundamental Commissioning and Verification, which is a mandatory prerequisite for all projects. This process ensures that key systems (such as mechanical, electrical, and plumbing) are installed correctly and meet the owner’s project requirements.

Projects can also pursue Enhanced Commissioning as an optional credit to earn extra points toward LEED certification. Enhanced Commissioning expands the scope to include early design review and ongoing verification for up to 10 months after occupancy, helping achieve higher energy efficiency and optimal building performance.

Can Commissioning Help My Organization Meet Sustainability Goals?

Absolutely. Commissioning ensures that all building systems operate as designed, which directly supports sustainability efforts. By identifying and resolving performance issues early, commissioning helps buildings meet sustainability standards, reduce carbon emissions, and achieve green building certifications such as LEED.

Can Commissioning Improve Occupant Satisfaction?

Yes. Commissioning optimizes building systems to create comfortable, healthy, and safe indoor environments. Properly functioning HVAC, controls, lighting, and ventilation reduce temperature inconsistencies, noise, and air quality issues—directly impacting occupant comfort and productivity. In offices, schools, or healthcare facilities, these improvements can lead to higher employee performance, fewer complaints, and better overall satisfaction.

Next Steps

Commissioning is fundamental to the success of a project and delivers many measurable, bottom-line benefits to owners, occupants, design and construction teams, the environment, and the general public.

For more information on how building commissioning can help you optimize your building systems, contact The Concord Group. Our team of experienced engineers and technical professionals can help you reduce your risk, mitigate critical issues, and deliver a cost-effective solution for the performance of your facilities. Our tailored approach to commissioning is geared toward efficiency and sustainability, ensuring it will have a positive outcome for your facility operations and occupants.

About The Author

Picture of Justin Johnson, PE, CxA, BECxP

Justin Johnson, PE, CxA, BECxP

Justin Johnson is Director of Building Performance Services at The Concord Group, where he leads commissioning, facility assessments, and sustainability consulting projects. With a background in mechanical engineering and years of commissioning experience, Justin ensures buildings perform to the highest standards of function, efficiency, and sustainability. He is known for his collaborative approach with clients, design teams, and contractors to deliver reliable outcomes.

Share This article

The Concord Group is a development + construction consulting firm providing a comprehensive and fully integrated suite of project management controls that mitigate risk throughout the lifecycle of a project or capital program. We specialize in Owner’s Representation, Cost Estimating, Medical Equipment Planning, and Building Performance Services (including Commissioning, Facility Condition Assessments, and Sustainability Consulting).

Since 1996, our team of highly skilled construction cost consultants, project managers, owner representatives, cost estimators, medical planners, and engineers has successfully completed over 4,000 projects throughout the United States. We have built a reputation for delivering high-quality, accurate, and timely work for governmental agencies, healthcare organizations, institutional clients, and architectural/engineering firms, along with retail, residential, and property development companies.

Get the latest from The Concord Group

Subscribe to our Newsletter